First, the customer name:
Beijing New Energy Automobile Co., Ltd. Qingdao Branch
Second, the project profile:
1. Scope of supply: Engineering design, manufacture, installation and commissioning of the instrument panel AGV logistics distribution system.
2, project introduction
Beijing New Energy Automobile Co., Ltd. Qingdao Branch belongs to BAIC Group, which mainly produces new energy electric vehicles. The AGV project is used for assembly and transportation of instrument panel in assembly shop. AGV transports assembled instrument panel through traction trolley. The trimming line is installed. The AGV returns to the instrument panel line with the empty trolley to continue assembly and cycle operation to meet the 40JPH beat of the production line and meet the 40JPH beat of the production line. AGV adopts the track navigation system and realizes unmanned automatic transportation through the instant communication of the control system with other management systems. It is the choice for the automotive industry to enhance the competitiveness of the industry, reduce labor costs and improve the efficiency of warehouse allocation.
AGV parameters:
1. AGV form: latent traction
2. Operating speed: 0-45m/min
3. Rated load: 0-2000KG
4. Positioning accuracy: 0-10mm
5. Guidance method: magnetic strip navigation
6. Charging mode: online automatic charging
7. Up and down line mode: fully automatic upper and lower line system
All rights reserved:OMH SCIENCE Group Co.,Ltd.
Record number:Jin ICP No.12001603
Technical Support:Long Cai Technology (Shanxi) Co., Ltd.
All rights reserved:OMH SCIENCE Group Co.,Ltd.
Record number:Jin ICP No.12001603
Technical Support:Long Cai Technology (Shanxi) Co., Ltd.